Browsing This

Northrop Grumman’s 100 kilowatt laser dismissed for 6 hours true

Posted in December 12th, 2010
Published in 100 kilowatt

Northrop Grummans 100 kilowatt laser dismissed for 6 hours true

100 kilowatts of trenchant light isn’t something to sneeze at, even fired for only a couple of seconds, though Northrup Grumman’s long-awaited weapons-grade laser not long ago ran for the full 6 hours. That milestone is a feather in a company’s cap as it prepares to ship a hulking appurtenance to a White Sands Missile Range in New Mexico, where it will as if begin you do what it does most appropriate — branch things into crispier, some-more exploded versions of themselves in no time prosaic. PR after a break. Show full PR textNorthrop Grumman-Built Joint High Power Solid State Laser Keeps Lasing … and Lasing … and Lasing …

REDONDO BEACH, Calif., Dec. 8, 2010 (GLOBE NEWSWIRE) — The kick goes upon for a world’s most powerful and reliable solid-state troops laser.

Since becoming the first to stretch the 100-kilowatt power level threshold for the solid-state laser in 2009, Northrop Grumman Corporation (NYSE:NOC) has continued to push a opening parameters of a Joint High Power Solid State Laser (JHPSSL). Company engineers as well as technicians have logged some-more than six hours of operating time — all at energy levels greater than 100kW — with the JHPSSL complement as they hope for to confederate it with the pointing as well as tracking complement for field testing.

“We don’t know of an additional 100kW solid-state laser anywhere which has operated invariably for more than the couple of seconds,” pronounced Steve Hixson, vice president of Advanced Concepts – Space and Directed Energy Systems for Northrop Grumman’s Aerospace Systems zone. The 6 hours of run time for JHPSSL doesn’t embody low-power operations used for slight upkeep, he combined.

“That kind of opening is forlorn in a world of high-energy lasers,” Hixson one after another. “The very reliable JHPSSL complement only keeps lasing … as well as lasing … as well as lasing.”

A vital military unite for JHPSSL further remarkable a laser’s reliability as well as dependability.

“Northrop Grumman has created a bullion customary for high-power, solid-state lasers with the JHPSSL complement,” said Mark Neice, executive, Office of a Secretary of Defense, High Energy Laser Joint Technology Office. “Not usually did the company demonstrate a full set of opening qualities compulsory for a solid-state laser arms, though its achievements during a final 18 months remained unmatched in a village.”

Northrop Grumman is putting JHPSSL by its lasing paces to hope for for the relocation from a company’s laser bureau in Redondo Beach, Calif., to the specialized, high-energy laser exam operation during White Sands Missile Range, N.M., the High Energy Laser Systems Test Facility (HELSTF) for field tests.

Once there, JHPSSL will be integrated with existing beam control and authority as well as control systems to form the core of a U.S. Army’s Solid State Laser Testbed Experiment.

“We have been handling JHPSSL to prepare for operations associated with the test site environment, timelines as well as procedures,” pronounced Dan Wildt, vice boss of Directed Energy Systems for Northrop Grumman. “We also have been collecting brand-new report to await integration with a pointer-tracker system and the destiny formation experiment involving a mobile, ground-based laser weapon.”

“As the challenges to our deployed forces continue to shift, JHPSSL can provide a proven, affordable transition to fielding the troops laser arms capacity in the near-term. We’ve shown time as well as again which this solid-state laser record is capable, grownup as well as ready to proceed fortifying our forces,” Wildt emphasized.

Martin Wacks, JHPSSL program manager, said JHPSSL’s ongoing reliability as well as robustness is the covenant to the group which put together the insubordinate capability. “This achievement in solid-state laser record has perceived far-reaching approval because those inside as well as outward the industry realize its potential for near-term military uses.”

The JHPSSL module is saved by a Office of a Assistant Secretary of the Army for Acquisition, Logistics, as well as Technology, Washington, D.C.; Office of a Secretary of Defense – High Energy Laser Joint Technology Office, Albuquerque, N.M.; Air Force Research Laboratory, Kirtland Air Force Base, N.M.; as well as a Office of Naval Research, Arlington, Va. Responsibility for module execution is reserved to a U.S. Army Space as well as Missile Defense Command/Army Forces Strategic Command in Huntsville, Ala.

Northrop Grumman Corporation is the heading global confidence company whose 120,000 employees provide innovative systems, products, as well as solutions in aerospace, electronics, report systems, shipbuilding and technical services to supervision as well as commercial business worldwide. Please revisit www.northropgrumman.com for some-more report.

Via Engadget

Share

No User Commented In " Northrop Grumman’s 100 kilowatt laser dismissed for 6 hours true "

Subscribes to this post Comment RSS or TrackBack URL

Leave Your Reply Below

 Username

 Email Address

 Website

Sticky note: Please double check your comments before submit Please Note: The comment moderation maybe active so there is no need to resubmit your comment

Get Adobe Flash player